xcc projects Bridges | Industrial | Railways | Rehabilitation | Roadways | Skywalks

Design and Extension of Bridges, Kalyan | Mass Rapid Transport, Mumbai | Nimach, Ratlam
XCC LOGO

PSC Girder of 12.2m and the 18.3m for Gauge Conversion, Nimach-Ratlam

Client : Chief Engineer, Western Railway
Duration : December 1998 - June 2000

Key Functions Performed : Data collection from Railways, Scheme of execution during short block and mega block, detailed engineering (designs and drawings)

Detailed description of Project and Services Provided : XCC prepared detailed structural designs and drawings for PSC girder of 12.2m and 18.3m span for MBG1987 loading in connection with Nimach-Ratlam Gauge Conversion Project suitable for replacement of existing steel girders.

xcc project at Nimach
about xcc
The Company
The Team
Advisors
Clients
Contact Form
XCC Locations
Advisory
Design
Pre-investment
Project Management
Specialist Services

(C)2010 XCC Engineers and Planners

The website is designed by Ascharya Creative Communications
XCC logo designed by Adwize, Bangalore